Scheduler: Step-by-Step
|
Previous Top Next |
Step 1: Entering Data
|
|
Select the New Task command from the File menu. From the appearing task properties window select the data to be erased and from the next page when it should be erased.
|
Step 2: Running Task
|
|
After saving the scheduled task, it will be run automatically without your confirmation. If you do not want to wait for a task to be processed, you can run the selected task any time using the Run command. You can stop a running task, scheduled or not using the Stop command.
|
Step 3: Viewing Results
|
|
After the operation you can view statistics on the third page of the task property window and if you have enabled logging, see possible errors using the View Log command.
|
[
|